![]() As well as performing the role of Prime Contractor, we also performed hand-placed tank trail concrete, building concrete, some specialty installation, and portions of the drywall, ceiling, framing and painting. This project also entailed us to provide a vehicle deployment processing center to include vehicle inspection, weighing, and staging for processing military vehicles and equipment for deployment by air, rail, or land. Installation of systems furniture requires a substantial amount of space to stage the furniture while it is being installed. Sustainable Design and Development (SSD) and Energy Policy Act of 2005 (EPA Act 05) features were provided. Anti-terrorism/Force Protection measure includes stand-off distance, laminated glass security lighting. Supporting facilities include utilities, electric service, site improvements and information systems. Also includes Information Systems and Mass Notification. VEMAC constructed a Brigade Staging Area Complex which includes an administration operations building, secure parking, two troop personnel shelters, tactical vehicle hardstand parking, an all-weather tank access road, small wash rack, an inspection area, two vehicle scales with scale building, defueling area, waste water treatment facility, intrusion detection system (IDS) installation, connections to energy monitoring and control systems (EMCS) and utility distribution lines. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2023
Categories |